[1]
D. Puspasari, Sukemi, and Y. D. Rusli, “CALCULATION CAPACITY PRODUCTION BASED ON THE LEVEL OF RAW MATERIAL NEEDS”, ULTIMA Management, vol. 18, no. 1, Jul. 2026.