CALCULATION CAPACITY PRODUCTION BASED ON THE LEVEL OF RAW MATERIAL NEEDS
DOI:
https://doi.org/10.31937/manajemen.v18i1.4546Abstract
Introduction/Main Objectives: UMKM Sate Abah Uteng , a typical Maranggi satay business from Plered , Purwakarta which was founded in 1990, experienced problems in maintaining the quality of raw materials, consistent and efficient production, as well as calculating the need for raw materials against consumer demand . Background Problems: This research focuses on calculating production capacity based on the level of raw material requirements . Novelty: focuses on calculating production capacity based on the level of raw material requirements . Research Methods: are used to analyze raw material needs and production capacity . Findings/Results: The analysis results show that the Economic Order Quantity EOQ for all raw materials is 0, so no orders need to be placed. Production capacity is not limited by the availability of raw materials, but by the number of workers available. Daily production should be in the range of 200 to 500 skewers with a number of workers of 1 to 3 people.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Dewi Puspasari, Sukemi, Yus Djunaedi Rusli

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike International License (CC-BY-SA 4.0) that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.












